Independent seismic and construction vibration monitoring.
EMS provides monitoring, condition surveys, and clear reporting for blasting, construction, quarry, and mine operations. We help clients understand vibration readings, evaluate them against applicable requirements, and maintain organized project records.
Why clients choose EMS
EMS brings together practical blasting experience, regulatory insight, and organized monitoring and reporting operations. We help clients understand the information collected, evaluate it against applicable project requirements, and maintain clear records for owners, agencies, insurers, and other stakeholders.
Where we monitor
Monitoring locations, recording settings, notification thresholds, and reporting are tailored to the vibration source, nearby structures, and applicable project requirements.
Construction vibration monitoring
Pile driving, demolition, hoe-ramming, compaction, and tunneling near occupied buildings, utilities, and transit.
- Ground vibration recorded at the structures and receptors identified for the project
- Recording settings and notification thresholds set for the activity and the project requirements
- Records that document conditions during the work for the contractor and the adjacent owner
Blasting monitoring
Construction and infrastructure blasting, including close-proximity work.
- Ground vibration (peak particle velocity, three axes) and air overpressure, as applicable
- Seismograph placement coordinated with the blast plan and the permit conditions
- Shot-by-shot records that support blast design and compliance review
Quarry and mine monitoring
Production blasting and plant operations near neighboring development.
- Permanent or long-term installations maintained over the life of the operation
- Periodic reporting against the operation's permit and applicable requirements
- Records that support review of neighboring-property concerns
How a monitoring program runs
Three stages. The scope of each is set for the project.
Plan and document
Review project requirements, identify monitoring locations, and document existing conditions through pre-blast or pre-construction surveys where included in the scope.
- Review of project specifications, permit conditions, and applicable vibration and airblast requirements
- Seismograph locations selected for the structures and receptors at risk, mounted to ISEE field practice
- Pre-blast or pre-construction condition surveys where included in the scope
- Monitoring plan prepared for submission to the owner or agency when required
Monitor and notify
Install and manage instruments, collect vibration readings, and provide configured threshold notifications by text and email.
- Calibrated instruments installed and managed for the duration of the work
- Continuous or event-triggered recording, set for the vibration source and the project
- Ground vibration in three axes and air overpressure where applicable
- Threshold notifications by text and email, configured for each project
Analyze and report
Interpret recorded data and provide event, periodic, and closeout reporting appropriate to the engagement.
- Event reports with peak particle velocity, dominant frequency, and air overpressure against the applicable requirement
- Frequency-based evaluation where the project criteria call for it
- Scaled-distance regression analysis to support blast design on blasting projects
- Monthly, quarterly, and closeout reports, and technical narratives for claims review
Condition surveys
A condition survey records what a structure looked like before the work started, so that any later question can be answered from the record rather than from memory.
- Pre-blast and pre-construction documentation of existing conditions
- Photographs and narrative records of structures, utilities, and finishes
- Post-work surveys where included in the scope
- Drone imagery where access on foot is unsafe or impractical and the scope permits
Condition surveys can be engaged on their own or as part of a monitoring program.
What a monitoring record shows
The excerpt shows a three-axis seismograph record of a multi-delay blast: longitudinal, transverse, and vertical ground motion plotted against time from the recording trigger. The marker on each axis is that axis's peak.
Peak particle velocity (PPV) is the highest ground velocity recorded on an axis, in inches per second. Dominant frequency is the main frequency of the ground motion at that peak, in hertz; many damage criteria allow higher velocities at higher frequencies.
The recording trigger is the level at which the instrument begins saving a record. It is an instrument setting, not a project limit. Readings are evaluated against the limits set for the project, which depend on the structures nearby, the permit, and the applicable criteria.
Technical references
Which criteria apply depends on the project, the jurisdiction, the permit, and the scope of the work. We identify the applicable requirements for each engagement.
- USBM RI 8507 and OSMRE frequency-based criteria
- FDNY Fire Code Chapter 56 and NYC DOB permit conditions
- NYS Department of Labor Industrial Code Rules 39 and 61
- MSHA and state mining permit conditions
- Transit agency and utility protection requirements
- Project-specific vibration and airblast limits
Need vibration monitoring on your project?
Tell us the project location, work activity, schedule, and nearby structures or infrastructure. We’ll help define the monitoring, survey, and reporting support your project needs.